NPC Ukrenergo
Construction and repair works at a 330 kV substation.
Delivered on schedule, on a live transmission site.
Projects
1,000+ km of lines, 7+ substations, 32 prosumers. References you can verify — call our clients and ask.
Construction and repair works at a 330 kV substation.
Delivered on schedule, on a live transmission site.
0.4 kV cable line reconstruction, 35/6 kV substation, 150 kV substation retrofit.
Upgraded infrastructure across three voltage classes.
Row of STORION-LC-TB125 with STS cabinets, AI charge/discharge dispatch.
Peak shaving + DAM arbitrage in a single asset.

Cathodic protection works on a trunk pipeline.
Protection of nationally critical infrastructure.
STAX G2 modular battery with a hybrid inverter.
6-hour autonomy and evening peak shaving.
Diesel genset connection, AMR commissioning.
Uninterrupted store operations through outages.
0.4/10 kV transformer upgrade, PV connection, prosumer status.
Generation revenue instead of electricity bills.
List per the completed-contracts reference; client consent to publication confirmed.
Mykolaivoblenergo JSC
Ukrtransnafta JSC
NPC Ukrenergo
Darnytsia CHP (Euro-Reconstruction)
State Administration of the Verkhovna Rada of Ukraine
Tell us about your site — we’ll match relevant experience and references.