Utility
AlphaESS Aster TB250/TB500
20-ft container with the full power train inside: PCS, transformer, EMS and liquid cooling pre-integrated. Mechanical installation on a ready foundation takes 3–5 days.
from $163/kWh · excl. VAT
Technical specifications
- Price
- $163/kWh excl. VAT · TB250 (705 kWh) — $114,915 · TB500 (1,410 kWh) — $229,830
- Type
- AC-coupled · 20-ft container
- Power
- 250 kW (TB250) · 500 kW (TB500)
- Capacity
- 705–1,410.7 kWh
- DC bus
- 1,000 V · operating range 631.8–842.4 V
- Battery module
- 52.2 kWh · M166314-52S-EX · IP67
- AC output
- 400 V (±15%) · 50/60 Hz · 440/880 A
- Fire safety
- Aerosol suppression
- Dimensions
- 6,058 × 2,438 × 2,896 mm
- Enclosure
- IP55 · −30…+50 °C
- Certification
- UL 9540A · IEC 62619 · IEC 62477 · UN38.3
Based on the Aster TB250/TB500 V2.3 datasheet (12.2025). Indicative equipment prices in USD excl. VAT as of October 2026; installation, commissioning and grid connection are quoted in the proposal.
FAQ
What is inside the Aster TB250/TB500 container?
Everything is factory-integrated: a 705–1,410 kWh LFP battery, a 250–500 kW PCS, transformer, EMS and fire suppression in a 20-ft container. On site: foundation, cabling and commissioning.
What is Aster TB250/TB500 used for?
DAM energy arbitrage, peak shaving and backup for enterprises from 0.5 MW, a buffer for renewable generation. The SES AI platform controls charging and discharging automatically.
How much does Aster TB250/TB500 cost?
$163/kWh excl. VAT for the equipment: TB250 (250 kW / 705 kWh) — $114,915, TB500 (500 kW / 1,410 kWh) — $229,830 per container. The final budget depends on the number of containers, grid connection and foundation. Send your consumption profile — SES engineers prepare a feasibility study with payback at your DAM prices.
Other AlphaESS models
- STAX G2 (M30/M50) — 30–50 kWh · C&I · compact
- STORION-H30/H50-G3 — 72–241 kWh · C&I
- STORION-LC-TB125 — 261–522 kWh · C&I · liquid cooling
- STORION-LC-TB150 — 313–627 kWh · C&I · liquid cooling
- STORION-LC-H125 — 261–522 kWh · C&I · hybrid · liquid cooling
- Aster 5000 — 5,015 kWh · Utility · lineup flagship
Related solutions
What is a BESS — battery energy storage explained
Energy storage in plain words: components, where it earns money, BESS vs a diesel generator, where a business should start.
Learn moreSolar power plants on LONGi modules
PV plants from 100 kW: trackers, ballast, BIPV facades and roofs. Pairs with AlphaESS storage.
Learn moreJCvision EV charging stations 12–480 kW
AC and DC chargers for car parks, malls, fuel stations and fleets: grid capacity, installation, OCPP billing, service.
Learn moreJCvision LED screens P0.9–P10
Nine series: media facades, video walls, rental, transparent and flexible screens, LED posters — turnkey structure design, power, installation, content software.
Learn moreSize it for your profile?
Send your hourly consumption profile — we will return a feasibility study with real DAM prices.
Request a proposal→